Real-world retrofit, PLC revamping and supervision projects.
Find out how we modernise our clients' plants, working within production schedules and without compromising on safety.

Our projects

From foundries to industrial services: a selection of interventions on operational plants, addressing system obsolescence, new control architectures and tight shutdown windows.

image of production line (for a manufacturing plant)
PLC REVAMPING

Revamping the control system of a production line

Replacement of end-of-life PLC, operator panel and sensors, with no production downtime.

image of production line (for a manufacturing plant)
RETROFIT & SAFETY

Complete automation renewal for a sand-resin plant

New PLC, integrated safety and WinCC supervision in a single scheduled August shutdown.

image of production line (for a manufacturing plant)
TAG

Title

Description

image of production line (for a manufacturing plant)
TAG

Title

Description

INDUSTRIAL AUTOMATION

Frequently asked questions about our projects

Answers to the most common questions from those considering a retrofit or revamping project for an existing system.

What is an industrial automation retrofit?

It is the process of upgrading the control system of an existing plant (PLC, HMI, supervision, networks, safety) while retaining the mechanical components. It allows you to resolve component obsolescence without having to replace the entire machine.

When is it worth replacing a PLC?

When the PLC is no longer supported, spare parts are hard to find, or maintenance becomes too costly. Taking action before a failure occurs reduces the risk of unscheduled production downtime.

How long does work on an active production system take?

It depends on the complexity. We typically work during scheduled downtime (for example, four weeks) or on machines that are temporarily offline, so as not to halt production.

Does a retrofit require a new risk assessment?

Not necessarily. If the functions, performance, and safety logic remain unchanged and the replaced devices have an equivalent or higher PL, the work may be classified as extraordinary maintenance.

What technologies do you use?

We work with Siemens and Weintek platforms, using Profinet®, Profisafe®, and IO-Link networks, as well as WinCC supervision. We select technologies based on the system and the long-term availability of spare parts.

Can I see cases similar to my system?

Certainly. Tell us about your situation: we can show you similar projects and discuss the work required.

Do you have a system that needs work?

Tell us about your requirements: one of our engineers will get back to you to assess feasibility and timelines together.