A dairy company commissioned Treesse Progetti to replace its existing HMI system with a more comprehensive and functional supervision platform, equipped with four monitors and designed to improve the user experience and facilitate the operators' daily tasks.
Client: Dairy company
Sector: Dairy
Intervention: New SCADA system
Technologies: Ignition Perspective, Siemens S7-1500 and S7-300 PLCs, Ignition Gateway on a virtual machine
Objective: Development of a SCADA system for plant supervision and control
The challenge was to make the plant more functional and "readable" for operators by replacing the existing HMI with a more modern SCADA system.
Ignition Perspective SCADA system replacing the existing HMI for plant monitoring and management. The Gateway runs on a VM at the client's site. Two workstations: one in production with four monitors for control and production cycles, and one in the offices for remote consultation. The system, based on the client's Ignition licences, communicates with the existing Siemens S7-1500 and S7-300 PLCs.
The main technical challenge was developing the new SCADA system by adapting it to the structure and logic of the existing PLC software without modifying its operation. The integration required careful attention to variable management and interaction with the already implemented automation logic, ensuring the plant's operational continuity.
After defining objectives and requirements with the client, we developed the solution at our premises. The work includes interactive synoptics, interfaces for production and cleaning cycles, windows for configuring process parameters and pasteurisation cycles, monitoring, PID tuning, alarm management, historical trends, and auditing.
Process variables and alarms are recorded and logged to support analysis and traceability.
The SCADA was integrated with the existing automation system, keeping the control logic and PLC software unchanged.
The project leveraged the Ignition Perspective licences already owned by the client, keeping the investment down.
The developed system allows for the expansion of control to portable devices (such as tablets) so that operators can manage specific functions directly in the field.


What we did in this project and what to consider before switching from an operator panel to a SCADA system.
It depends on the PLC software structure; potentially, the existing operator panel can remain active and work in parallel with the new SCADA.
No: Ignition was installed on a virtual machine within the client's existing infrastructure; a PC and monitors were provided.
Tell us about your requirements: one of our engineers will get back to you to assess feasibility and timelines together.